TECMARINE®
Request a repair
TM-01Sheet index

Services

Six fronts of ship repair, from steel renewal to propulsion, carried out on board or in the dock.

All services
TM-02Sheet index

Tools

Answers before the quote: where a damaged ship can go, and whether the repair fits the hours alongside.

All tools
TM-03Sheet index

Reports

Technical notes written by the people who work on the hull.

All reports
TM-04Sheet index

Company

TECMARINE Serviços Marítimos Ltda — ship repair from Santos since 2012.

Company
TM-REG-2012CNPJ
Legal name
TECMARINE SERVIÇOS MARÍTIMOS LTDA
CNPJ
15.340.488/0001-73
Registered
Since 2012
Base
Santos – SP
DRAWN · TECMARINE®SHEET 1/1
14years
Service 06

Piping

Corroded pipes fail where they are hardest to reach. We measure, fabricate and install new spools, valves and supports, and test them before the system goes back into service.

Systems
Ballast · bilge · fire · fuel · cargo
Materials
Carbon steel, galvanised, stainless
Tests
Hydrostatic and tightness
DWG TM-160PipingA
  1. AButterfly valve
  2. BSection to renew
  3. CPipe support
[S.01]

What we do

01 / 05
  1. 01Survey and measurement of pipe runs on board
  2. 02Spool fabrication with flanges and fittings
  3. 03Renewal of corroded sections and supports
  4. 04Valve overhaul and renewal
  5. 05Hydrostatic and tightness testing
  6. 06Isometric sketches for the ship's records
Where on the ship

The ballast main inside the double bottom — renewed and pressure-tested.

[S.02]

How we work

02 / 05
  1. 01

    Measure

    Pipe runs, flanges and supports measured on board, with an isometric sketch for each spool.

  2. 02

    Fabricate

    Pipe, flanges and fittings of the right class and material, welded to procedure.

  3. 03

    Install

    Old sections removed, new spools fitted with gaskets, bolts and supports.

  4. 04

    Test

    Hydrostatic test at the specified pressure, witnessed and recorded.

[S.03]

What you receive

03 / 05
DOC · 01Isometric sketches
DOC · 02Material certificates
DOC · 03Welding and NDT records
DOC · 04Pressure test reports
DOC · 05As-fitted records
References
  • Class rules for piping systems
  • ASME B31.3 · ISO 15614-1 — pipe welding
  • ASME B16.5 · EN 1092-1 · JIS — flanges
[S.04]

Questions

04 / 05
Q.01What happens to galvanising when a pipe is welded?

Welding burns it off. Spools are galvanised after fabrication, or the welded areas are repaired with a zinc-rich coating where the system allows.

Q.02What pressure is used for the test?

The test pressure follows the class rules for the system, usually a multiple of the design pressure; it is agreed before the test and recorded.

Q.03Can new spools match the existing flanges?

Yes. Flange standard, rating and drilling are measured on board, so new spools fit the existing valves and equipment.

Request a repair.

Tell us the ship, the port and the job. We reply with questions, a plan or a quote.